Transportation infrastructure investment projects of EURO-2012 in the Ukraine

In order to accomodate UEFA EURO-2012 games Ukrainian government has come up with a number of projects which require significant financial participation of foreign and domestic investors and concessionaires.

Projects address an urgent need in a new network of high-ways, tolls and traffic management systems.

Different projects have different priorities and time frames. Some of them are already actively developed, and some are still at the preparational stage.

It is important to note that that all interested investors will be placing their assets under state guarantees and according to International legislation. And Ukrainian goverment itself will play a major shareholder role in all listed projects

Below are a few of them to look at and decide whether your business is interested to pursue any of them and request a detailed disucssion on the subject.


EURO-2012 needs a new network of high-ways, tolls, traffic management systems
Different projects have different priorities and time frames
Some projects are already actively developed, and some are about to start
There are two project types: concession and investment
All projects to be supported by state guarantees
Goverment will play a major role of a shareholder in all projects
A special-purpose investment fund formation is proposed

Speed Rail from Boryspil Airport to Kiev Downtown more on Boryspil Airport developments

Project Category - Concession under Ukrainian governemt guarantees
Total Project Cost - 280 million US Dollars
Length of trace is 38 km (24 miles)
Concessionaire - local (Ukraine) and international
State participation - up 25% of total construction cost
Realization stage - feasibility study by one of interested parties
Special announcement:
Japanese company Itochu has officially confirmed its interest and participation in the Speed Rail feasibility study.
It is more than likely that other Japanese businesses will intencify their efforts to obtain Ukrainian government
guarantees in support of listed below projects.

Lviv-Brody Road see map
Lviv-Krakovets Road see map

Project Category - Concession
Category IA (4 lanes)
Length of trace is 78,8 km
Construction cost 2,7 bln UAH
Concessionaire - local (Ukraine)
State participation - 21% of total construction cost
Realization stage - road allocation is completed, incl. 30% of design scope



Project Category - Concession
Category IA (4 lanes)
Length of trace is 84,4 km
Construction cost 2,9 bln UAH
Concessionaire - local (Ukraine)
State participation - 40% of total construction cost
Realization stage - initial 34,3 mln UAH, incl. 30% of design scope

Greater Kyiv Beltway see map

Project Category - Investment
Category IA (4 - 6 lanes)
Length of trace is 213 km (133 miles), where 65 km already in place
Construction cost 2,9 bln UAH
Land allocation - 1415 hectars (3497 acres)
Bridges - 50, including 3 large: 8220 + 4510 m, 1505 m, 8910 m
Two-level Interchanges - 35
Earthworks volume - 21 840 000 m3
Total road pavement - 3 874 000 m2
Atomatic Traffic Management - required
Road Maintenance infrastructure and Services - required
Environment protection - required
SCost - 3 700 mln Euro


Odesa-Reni see map
Scherbakivka-Kiev-Kharkiv Dovyansky Road see map

Project Category - Investment
Category IA (4 lanes)
Length of trace is 261 km
Construction cost 12,9 bln UAH (2007 prices)
Bridges - 7
Two-level road interchanges - 23
Earthworks volume - 8 200 mln m3
Pavement area - 5 200 000 m2


Project Category - Investment
Category IA (4 lanes)
Length of trace is 48,8 km
Construction cost 1,7 bln UAH (in 2006 prices)
Bridges - 3 + 26 pipe bridges + 8 pedestrian bridges
Land allocation - 405,9 henctars
Earthworks volume - 19 350 mln m3
Pavement area - 3 600 000 m2